Back to doing work in Crete '41
Tavronitis bridge sections being prototyped. But of trial and error at the moment. Concept works need to do some tweaking
(https://i.postimg.cc/bGFXgYfC/IMG-2694.jpg) (https://postimg.cc/bGFXgYfC)
(https://i.postimg.cc/HcJqhGpp/IMG-2695.jpg) (https://postimg.cc/HcJqhGpp)
(https://i.postimg.cc/8j8SxCJx/IMG-2697.jpg) (https://postimg.cc/8j8SxCJx)
(https://i.postimg.cc/XrL6ZcH0/IMG-2698.jpg) (https://postimg.cc/XrL6ZcH0)
Nice work!
Simon
Completed section as a prototype. Lots of errors to fix.
(https://i.postimg.cc/mPnhnHMC/IMG-2699.jpg) (https://postimg.cc/mPnhnHMC)
Hello Si
You have this 3D mastered.
martin :)
Quote from: martin goddard on April 28, 2024, 06:17:51 PMHello Si
You have this 3D mastered.
martin :)
Needed some better terrain to do your FJ justice ;)
Blimey could have done with that 3 years ago ? Would saved myself a lot of work to bring the Skytrex bridge up to that standard?
Miles
Mock up done using just two sections. Scales okay for 15mm but Inthink I need to make it a bit shorter
Need to go back and redesign the end sections where it meets the bank as they should have an extra set of side planking. The base units when I drew them were meant to sit at the vertical posts and not where the angles join so will redo a set of 3 x 5 boxes and glue that together first.
The rest of the design just needs tidying up and some bolt detail adding.
(https://i.postimg.cc/HrZ8yRPd/IMG-2702.jpg) (https://postimg.cc/HrZ8yRPd)
(https://i.postimg.cc/Mf7jfGgF/IMG-2704.jpg) (https://postimg.cc/Mf7jfGgF)
(https://i.postimg.cc/XpgCVpfZ/IMG-2705.jpg) (https://postimg.cc/XpgCVpfZ)
(https://i.postimg.cc/3yk4C1Pp/IMG-2706.jpg) (https://postimg.cc/3yk4C1Pp)
(https://i.postimg.cc/218B3rG0/IMG-2707.jpg) (https://postimg.cc/218B3rG0)
Your paras look very nice too :)
Simon